Maintenance Operations & Site Works: AI for Accurate Cost Estimation
Sparkoper


WaterGuru
Sparkoper

At a utility company we recently worked with, project costs were hard to predict due to the varying needs of each job—different connection types, labor requirements, and material expenses. A residential project, for example, would sometimes cost more than anticipated, putting pressure on the budget.
With WaterGuru analyzing past project data, the utility was able to get more accurate cost estimations. For instance, industrial connections typically required higher equipment and labor costs, while residential jobs varied less. WaterGuru’s predictions enabled the utility to set a more accurate budget and optimize resource allocation, ultimately reducing cost overruns.

WaterGuru